National Data Cyberinfrastructure

Other languages:
English • ‎français


National Data Cyberinfrastructure (NDC)

Currently deployed in Production State:

Location File System Type Current Capacity Commissioned Detail
Simon Fraser University
cedar.computecanada.ca

Project

Lustre

10 PB

June 2017

  • Backed up to tape
  • Allocated through the RAC
  • Persistent

Home

Lustre

250 TB

June 2017

  • Backed up to tape
  • Persistent

Scratch

Lustre

3.5 PB

June 2017

  • Inactive data will be purged.
University of Waterloo
graham.computecanada.ca

Project

Lustre

12 PB

June 2017

  • Backed up to tape
  • All groups get a default allocation with larger awards allocated through the RAC
  • Persistent

Home

NFS

64 TB

June 2017

  • Backed up to tape
  • Persistent

Scratch

Lustre

3.2 PB

June 2017

  • Inactive data is purged.

Nearline

Lustre

80 PB

July 2018

  • File contents are moved to tape; stub files are left behind and their contents recalled transparently from tape when these files are accessed.
  • All groups get a default allocation with larger awards allocated through the RAC
  • Persistent
University of Toronto
niagara.computecanada.ca

Project

GPFS

2 PB

April 2018

  • Backed up to tape
  • Allocated through the RAC
  • Persistent

Home

GPFS

200 TB

April 2018

  • Backed up to tape
  • Persistent

Scratch

GPFS

7 PB

April 2018

  • Inactive data will be purged.

Archive

HPSS

10 PB

April 2018

  • Allocated through the RAC
  • Persistent