rsnt_translations
53,464
edits
(Marked this version for translation) |
No edit summary |
||
Line 23: | Line 23: | ||
<!--T:26--> | <!--T:26--> | ||
As part of the second phase of the CFI Cyberinfrastructure Challenge 2 program Cedar will be considerably expanded. Initial discussions with the vendor are in progress, and the expansion is expected to be carried out winter 2018. This should result in close to doubling the capacity of Cedar. | As part of the second phase of the CFI Cyberinfrastructure Challenge 2 program, Cedar will be considerably expanded. Initial discussions with the vendor are in progress, and the expansion is expected to be carried out winter 2018. This should result in close to doubling the capacity of Cedar. | ||
=Attached storage= <!--T:4--> | =Attached storage= <!--T:4--> |